Selected work

Lead Webflow developer for websites customers believe

A website should not just look good. It should make a customer believe the company before they call. I build to that standard in Webflow and custom front end code, and I take freelance projects.

A selection, not all
Webflow and custom code

Selected client work

Conversion focused web design, a selection of client sites

A selection of the client sites I have designed and built, with many more not featured here. Open any of them and judge the work for yourself.

I made the calls on each site, and I am grateful to the developers who built alongside me.

JT's Lawn & Landscaping website homepage

JT's Lawn & Landscaping

Lawn careWebflow

Lawn care website design for a family owned Louisville, Kentucky company, with a simple how it works path from free quote to curb appeal.

Opens the live site in a new tab
EVM Home Improvement website homepage

EVM Home Improvement

Painting & remodelingWebflow

Painting contractor website design for a New England remodeler, where the owner's video is part of the story, not an add on. It opens the home page, and a longer film on the About page lets homeowners get to know the company before they call.

Opens the live site in a new tab
Well Lit website homepage

Well Lit

Landscape lightingWebflow

Landscape lighting website design for a company serving Connecticut and Florida. The direction started as a feel for the brand and grew into a full sitemap with service pages, a project gallery and an interactive service area map.

Opens the live site in a new tab
Piscine Martin Banville website homepage

Piscine Martin Banville

Pool builder, FrenchWebflow

Pool builder website design for a Laval company. The centerpiece is my own custom liner selector, connected to the CMS: filter by color, texture and collection, then compare liners side by side, in French and English.

Opens the Webflow build in a new tab
Dumpster Dogs website homepage

Dumpster Dogs

Dumpster rentalWebflow

Dumpster rental website design for a Massachusetts and New Hampshire company, with a quote form and a tap to call number in the first screen, and a page for every dumpster size and every town it serves.

Opens the live site in a new tab
Illume Outdoor Lighting website homepage

Illume Outdoor Lighting

Outdoor lightingWebflow

Outdoor lighting website design for a Minneapolis installer of landscape, permanent and holiday lighting. It opens on a dusk photograph, keeps the phone number and a quote button in view as you scroll, and walks through discovery, design and installation.

Opens the live site in a new tab
Palm Shine Pros website homepage

Palm Shine Pros

Pressure washingWebflow

Pressure washing website design for a South Florida exterior cleaning company with seven services, from power and soft washing to paver sealing, gutters and window washing, each with its own page.

Opens the live site in a new tab
Diamond Lawn Services website homepage

Diamond Lawn Services

Lawn careWebflow

Landscaping and lawn care website design for a Brentwood, Tennessee company, bold in the brand's red with one clear path to a quote.

Opens the live site in a new tab
Bayshore Exteriors website homepage

Bayshore Exteriors

Exterior remodelingWebflow

Siding, windows and roofing contractor website design for Tampa. Returning customers still see the blue header, the headline and the orange estimate button they know, now in a cleaner, more modern layout.

Opens the live site in a new tab
United Turf website homepage

United Turf

Artificial turfWebflow

Artificial turf website design for a San Diego turf and backyard remodeling company, where a project carousel and multi service sections tied to the CMS, with custom code embeds, give the page a customized feel.

Opens the live site in a new tab
Purpose Landscaping website homepage

Purpose Landscaping

LandscapingWebflow

Landscaping website design for a Minnesota company that leads with four services, pergolas, custom landscapes, hardscaping and water features, and a booking form beside the first headline.

Opens the live site in a new tab
OC Home Services website homepage

OC Home Services

Home remodelingWebflow

Home remodeling website design for a Salisbury, Maryland contractor. A finished kitchen fills the first screen, four photo tiles lead straight to bathrooms, kitchens, interior and exterior work, and real customer words follow.

Opens the live site in a new tab
Downspout Services website homepage

Downspout Services

Gutter companyWebflow

Gutter and power washing website design for Rhode Island and Connecticut. I redesigned their old site to lead with their five star reviews and a free quote.

Opens the live site in a new tab
Open for freelance

Looking for a Webflow developer?

Freelance Webflow developer, open to new projects now. I do conversion focused web design for businesses that want visitors to believe them. Tell me about yours.

Talk about a project
Custom code for client sites

Webflow custom code for client sites, connected to the CMS

When a client site needs more than Webflow gives out of the box, I write the code. These interactive tools run on client sites, and most of them read straight from the CMS.

Pool liner selector filtered to dark patterned liners, grouped under the Contemporary collection
English site

Pool liner selector

Selector toolEnglish and French

Homeowners filter every CMS liner by color, texture and collection, pin a favorite image and compare up to four side by side. The same tool runs on the French site, ported with its CMS content in both languages.

Fiberglass pool finder showing pool categories, dimensions and needs beside a grid of pool models
English site

Fiberglass pool finder

Model finderEnglish and French

Lists every fiberglass pool model from the CMS, narrows them by category and size and links each card to that model's own page, in English and in a French port with its own CMS content.

Service areas map on desktop with a searchable city list on the left and a pin for each city on the map

Service areas map

Service areasWebflow CMS

An interactive map where every pin links to that city's page in the CMS. Visitors search the city list as they type, the map flies to the one they pick, and it works on phones too.

Reviews carousel titled Reviews from real customers, with a rating card, three review cards and dots

Reviews carousel

ReviewsCustom code

A reviews carousel with a rating card that stays in place while the review cards slide past. Visitors drag or swipe on any device or use the arrows and dots, and it advances on its own until they hover.

More custom scripts for client sites

Short scripts, each written for one specific job on a client site.

Call tracking crawler guard

Shows call tracking numbers to real visitors and the business's real phone number to Google and other crawlers, so listings and site never disagree.

UTM source keeper

Holds on to a visitor's UTM tags and ad click IDs for 30 days, carries them across the site and fills a hidden form field, so each lead shows where it came from.

Address autocomplete

Suggests full street addresses as a visitor types in a quote form, limited to Canada and powered by Google Places.

Custom service dropdown

A service dropdown styled to the brand, closing on Escape or an outside click, that still hands its value to the Webflow form on submit.

Before and after slider

Reads the two image URLs, clears the block and rebuilds a clean slider with a clip path reveal, so the site's own styles cannot break it.

Tools I built

Web developer tools I built, from a JSON-LD schema generator to an image compressor

Web apps I designed and coded myself: Portal, a desktop in the browser, most of the tools that open inside it, and a Webflow snippet library.

Browser desktop workspace with the before and after composer open as a window over a mountain wallpaper, and a taskbar with app search, notifications and settings

Portal

Workspace appWeb app

One workspace for a company's internal tools, each opening as a window, with sign in, roles, notifications and a task board.

JSON-LD schema editor with an organization form on the left and live valid JSON-LD on the right, with a Copy Schema button

JSON-LD schema generator

JSON-LD toolWeb app

Fill in an organization's details and it writes valid JSON-LD schema markup as you type, ready to copy or export, with import for existing work.

llms.txt editor form filled with a developer profile and three key pages with paths and short descriptions

llms.txt Editor

llms.txt toolWeb app

Builds a site's llms.txt from a simple form covering identity, key pages, services, locations and knowledge, with live raw and preview views, a token count, import and export.

Image compressor with the drop zone and output settings, a summary of 4 files from 2.01 MB to 1.34 MB, and the first compressed file

Image Compressor

Image toolWeb app

Compresses a batch of images in the browser without losing clarity, with a quality slider, a format choice and a size lock, and shows the savings for every file.

Favicon and webclip generator with a square monogram icon loaded, zoom and snap controls, and Favicon and Webclip export buttons

Favicon Converter

Site icon toolWeb app

Turns one image into a 32 by 32 favicon and a 256 by 256 webclip PNG, with zoom and snap to frame the crop.

Before and after composer with a dull before photo and a vivid after photo placed side by side in one 1920 by 1080 frame

Before and after image maker

Image toolWeb app

Combines a before photo and an after photo into one exact frame, side by side or stacked, with the aspect ratio, canvas size and divider set, then exports a single image.

Day planner room with My Day and Colleague's Day columns, morning and afternoon tasks, and finished tasks marked green

FlowDaily

Task plannerWeb app

A shared daily task planner. Two people join a room with a code and each get a column, split into morning and afternoon tasks, that syncs live.

Snippet editor with scrollbar width, track, thumb and border controls beside a live scrolling preview and the style code

Webflow snippet library

Code snippetsWebflow

A library of Webflow code snippets. Each one is tuned with real controls beside a live preview, then its style and script blocks copy straight into a project.

Experience

From Webflow developer to lead web developer

I lead web development on client projects, from the first sitemap and design direction to the custom code and launch.

  • EstateHubLead web developer2026
  • EstateHubWebflow developer2024 to 2026
  • Alpha Dental SolutionsWeb developer2024
  • A Closer LookBusiness development support2022 to 2024

Portrait of Rian Ray De AsisLet's work together